Civil engineering and pipeline construction Broadband trade, feeding and installation of fiber optics and accessories, delivery and construction of PoP
Construction of an NGA network together with house connections, house connection management, delivery and construction of a PoP building in Bollschweil.
Among other things, services in underground cable line construction must be carried out in conventional and special civil engineering processes; Supply and installation of Speedpipe pipe assemblies; Supply, feed and assembly of fiber optic cables in various dimensions; Supply and installation of cable shafts and above-ground pipe distributors.
Length of the cable trenches in the main line: approx. 20 km
Length of cable trenches on private land (house connections): approx. 3 km
Length of the construction section in the flush drilling process: approx. 3 km
Number of house connections to be manufactured: approx. 160 pieces
Length of speedpipe pipe assemblies to be supplied (various dimensions): approx. 56 km
Length of fiber optic cables to be supplied (various dimensions): approx. 96 km