Kiesbelag 145 m²
Sitzmauer vorh. Stones 12 m
Tread plates 63 pieces
greening
The existing primary and secondary school will be renovated during ongoing operations. The inner courtyard between the buildings will be redesigned. Access to the inner courtyard is only possible through the auditorium. The existing flooring in the auditorium must be protected.