The purpose of this contract is:
i) phase I: the supply and installation of control cabinets for all the infrastructures comprising the ski lift located along Annette and Lubin Hill at Spa;
ii) phase II:
a) the inspection and the preventive maintenance of all the infrastructures allowing the normal operation of the 2 cabins constituting said lift;
b) the repair of these infrastructures in case of breakdown and malfunction.
i) phase I: the supply and installation of control cabinets for all the infrastructures constituting the ski lift located along the Annette and Lubin Hill at Spa (see site plan in annex V);
ii) phase II:
a) the inspection and the preventive maintenance of all the infrastructures allowing the normal operation of the 2 cabins constituting said lift;
b) the repair of these infrastructures in case of breakdown and malfunction.