Building 24, station 19
- modernization and extension building,
- structural work,
- excavated earth,
- demolition work.
Shell:
Winter construction concrete 150m
new building:
Excavation of earth, removal 1,000 m
In-situ concrete floor slab, ceilings 390 m
In-situ concrete of the walls 170 m
Formwork ceiling panels 1,000 m
Wall formwork 1,850 m
Flights of stairs 2 pc
Reinforcing steel, rod + mat 65 to
Concrete core temperature control 640 m
Excavation of pipe trenches + backfilling 1,500 m
Drainage sewer lines DN 110-250, zzg. Molded parts 600 m
Old house:
Demolition of ceilings, various mixed constructions 100 m
Demolition of brick masonry, various thicknesses of 210 m
Wall demolition starboard, various thicknesses 115 m
Saw cuts wall, various thicknesses 80 m
Saw cuts base plate 15 m
Underpinning 11 m
Concrete backfill, foundation floor slab 30 m
Slab formwork 125 m
Concrete ceilings 30 m
Formwork walls, columns, beams 300 m
Concrete walls 100 m
Reinforcing steel, rod + mat 16 to