Main construction services for the new construction of a combined pool facility:
Site equipment:
2 tower cranes civil engineering:
Installation and provision of a closed water drainage approx. 1,350 m² removal of topsoil approx. 7,750 m³ excavation plus subsoil replacement approx. 400 m ground pipe construction Shell construction:
approx. 300 t of reinforcing steel supply and installation approx. 1,500 m³ of in-situ concrete approx. 1,600 m² of sand-lime brickwork approx. 2,000 m² perimeter insulation Prefabricated staircase and benches supply and installation Delivery and installation of steel supports for hall roofs Miscellaneous:
Earthing system Lightning protection Conduit and can installation Electrical
Main construction services for the new construction of a combined pool facility:
Site equipment:
2 tower cranes civil engineering:
Installation and provision of a closed water drainage approx. 1,350 m² removal of topsoil approx. 7,750 m³ excavation plus subsoil replacement approx. 400 m ground pipe construction Shell construction:
approx. 300 t of reinforcing steel supply and installation approx. 1,500 m³ of in-situ concrete approx. 1,600 m² of sand-lime brickwork approx. 2,000 m² perimeter insulation Prefabricated staircase and benches supply and installation Delivery and installation of steel supports for hall roofs Miscellaneous:
Earthing system Lightning protection Conduit and can installation Electrical