Purpose of the adoption
The purpose of the adoption is to:
- To install a separate sewerage system along the N10 from Houwstraat in Berlaar to Wouwerstraat in Heist-op-den-Berg;
- Separate one-way cycle paths along the N10 from Houwstraat in Berlaar to Wouwerstraat in Heist-op-den-Berg;
- Renewal of top layer from the Houwstraat in Berlaar to Wouwerstraat in Heist-op-den-Berg;
- Construction of an access road between intersection N10xN15 and Wouwerstraat;
- Redevelopment of intersection N10xN15: construction of a turbo-ovonde with tunnelling for cyclists in reinforced concrete.
Description of the works
The contract mainly comprises:
- Preparatory works (organization of construction site and temporary measures, demolition elements, felling of trees, ...);
- Construction of RWA and DWA system;
- Landscaping;
- earthmoving;
- Road works;
- Shoring and dewatering of construction pits;
- Concrete, reinforcement and concrete structures: 5 access lanes and 7 tunnels including pump cellar;
- The related works;
- maintenance of the works during the guarantee period.
PUBLIC PROCEDURE FOR ADOPTION OF WORKS