The municipality of Kuerten writes Europe-wide for the period from 01.01.2022 (6:00 a.m.) to 01.01.2024 (6:00 a.m.
Uhr) will deliver natural gas in two lots.
Lot 1 includes the delivery of natural gas to a collection point in the municipality of Kürten. (control performance measurement with
Delivery volume of approx. 1.76 GWh/year (value from 2020))
Lot 2 includes the supply of natural gas to 24 delivery points in the municipality of Kürten. (default load profile with
Delivery volume of approx. 2.20 GWh/year (values from 2020))
Natural gas delivery to a collection point in the municipality of Kürten. (Control performance measurement with delivery volume of around 1.76 GWh/year (value from 2020))Natural gas delivery to a collection point in the municipality of Kürten. (control performance measurement with delivery volume of
approx. 1.76 GWh/year (value from 2020)
Natural gas delivery to 24 delivery points in the municipality of Kürten. (Standard load profile with delivery volume of around 2.20 GWh/year (values from 2020))Natural gas delivery to 24 delivery points in the municipality of Kürten. (standard load profile with delivery volume of approx. 2.20
GWh/year (values from 2020))