We ask for your offer for the overall design in accordance with this invitation to tender and the attached documents.
A project plan has been drawn up for the project, which pielavesi municipal council has approved at its meeting held on 17.4.2023. Ve4.2 of the project plan has been decided as the solution to be implemented. A more detailed project description has been prepared for the option to be implemented, which describes in more detail the scope and content of the project. The project description is attached to the invitation to tender.
The project includes the planning, renovation and demolition of the Opinportti building at Koulutie 1-3, block 32, as well as the design of a separate new building that will include a sports hall, a library, and teaching facilities. In addition, the project includes the planning of space changes and renovation of the current library building at Laurinpurontie 14, block 96. The area of the construction site is about 6828 m2.
The Opinportti building was built in 1959 and has a total area of 3590 m2, a floor area of 3351 m2 and a volume of 11800 m3. The area of the construction site is about 14400 m2. From the building will be demolished the so-called. The wing of the gymnasium and modifications and renovations are being carried out on the rest of the section. Aspects to be taken into account in particular in the design include accessibility, kitchen and dining, movement within and between buildings, teaching arrangements, multifunctionality and adaptability of the premises.
The extension to Opinportti, which will be implemented as a new building, is estimated to be approximately 2200 m2. The facilities would include a new three-block sports hall, a gymnasium with changing rooms, new library facilities, administrative facilities and teaching facilities that would house special classrooms such as technical work and handicrafts. In addition to the buildings, the design includes the design of the entire yard areas of the construction site. The planning of yard areas must take into account, for example, traffic, parking spaces, recess yards, and playgrounds and sports facilities.
The current library building was built in 1979 and has a total area of 1225 m2 and a volume of 4990 m3. The building will include facilities for the adult education centre, youth facilities and ylä-Savon Taito ry.