Construction of heating and central water heating systems as part of the expansion and conversion of the Ravensberger Gymnasium, in particular approx. 200 running metres. Dismantling of existing heating pipes, replacing exhaust systems of the two existing heat generators, WWB as a fresh water system, installing 139 radiators, laying approx. 3,100 square meters of underfloor heating, installing 3,000 running meters heating pipes made of electric steel, building 7 heating circuits on an existing heating distributor, setting up control systems for 7 ventilation systems, extensive core drilling work
Construction of heating and central water heating systems as part of the expansion and conversion of the Ravensberger Gymnasium, in particular approx. 200 running metres. Dismantling of existing heating pipes, renewing exhaust systems of the two existing heat generators, WWB as a fresh water system, installing 139 radiators, laying approx. 3,100 square meters of underfloor heating, installing 3,000 running meters heating pipes made of electric steel, building 7 heating circuits on an existing heating distributor, setting up control systems for 7 ventilation systems, extensive core drilling work.