Heating installations as part of the general renovation of the high-rise bunker for cultural use
Heating installations as part of the general renovation of the high-rise bunker for cultural use
The city of Kassel is planning the conversion of the Agathof bunker in Kassel. The building consists of a
Ground floor, a 1st floor and an attic. In the attic is the technical room
for heating. A new gas connection is required for the heating system, which enters the building via the east side and from there via the floors to the technical centre
Attic is managed.
In the technical centre, a new gas condensing boiler with shut-off and control fittings
built. The new heating installation is connected to this.
In the technical centre in the attic, the heating distributor for the supply of the
Radiators on the floors, the underfloor heating on the ground floor and the air heater in the
Attic positioned as well as additional installations such as pressure maintenance, degassing, etc.