Plumbing and heating.
- approx. 5,000 m of stainless steel pipe including insulation up to DN 50,
- approx. 1 150 m drainage pipes up to DN125,
- approx. 70 units consisting of shower, WT and toilet,
- 4 care combinations
- 2 x local heating transfer stations (200 kW),
- 2 x local heating transfer stations (200 kW),
- 2 x distributors, 5 groups each,
- 2 x indirect PWH generation (122 kW),
- approx. 2 100 m copper pipe including insulation up to DN 32,
- 196 St. tubular radiators, dismantling work, maintenance.