S 83 extension south of Meissen, new construction of retaining wall 3.8
250 m2 Oberflächensondierung
118 pcs depth sounding up to 6.0 m
Dispose of 1,351 t of soil
Remove 26 m3 of topsoil
Installing 18 m3 of topsoil
Making a 431 m3 excavation pit
Making 460 m2 of grade
Supplying and installing 352 m3 of floor
Perform 64 m clearance gauge cut
3 pcs Cutting down trees
3 pcs Make tree shelter
Making 150 m2 of wet sowing
Laying 150 m2 of erosion control mat
61 m Roughbed trough, LMB 40/200
200 m3 of pipeline trench making, backfilling
Manufacture 200 m2 girder screed shoring (anchored back)
Install 160 m grouting anchor for shoring
3 pcs Installing street drains
27 m Manufacture plastic pipeline DN150
Making 20 m concrete pipeline DN500
30 m camera inspection incl. cleaning
Absorb 134 m3 layers without binder
50 m Banquet making
Making 183 m3 of frost protection layer
Making 48 m2 of gravel base course
Milling 200 m2 of asphalt pavement
182 m2 of asphalt pavement (ATS)
200 m2 of asphalt pavement (ADS)
131 m Joint connection to make asphalt
Setting 54 m of building curbs
170 m of concrete curbs
Set 10 m of natural stone shelves
Making 54 m strips from natural stones
Pick up 182 m2 paving surface (natural stone)
60 m2 of paving with lawn paving stones
504 m Manufacture micropiles/grouted piles for foundations
32 m3 unbewehrten Concrete repair (Sauberkeitsschicht u. Hinterfüllungen)
Install 18 t of reinforcement
156 m3 bew. Making concrete
Making 30 m2 of structural formwork
Install 54 m spar railing
Making a 66 m2 drainage layer
Making 92 m2 of sealing layer
Installing 77 m of joint tapes
65 m of protective fence
Dismantling 155 m FRS incl. AEK
Build 157 m FRS incl. AEK
135 m Making markings
Dismantle 3 pcs wooden mast (Telekom)
Laying 110 m of protective conduit