Road bridge construction work | Tenderlake

Road bridge construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 June 2021
Closing Date:
27 July 2021
Location(s):
DEE0A Mansfeld-Südharz (DE Germany/DEUTSCHLAND)
Description:
Lot 4.2_B180, new construction BW 4A and production of a construction road for BW 5UE

B180 village bypass Aschersleben-Süd/Quenstedt

Lot 4.2_B180, new building BW 4A (0898), bridge over the L 229 and manufacturing of a construction road to BW 5UE.

The following key benefit is included in the tender:

— topsoil removal 3 386.00 m³,

— cover topsoil 230.00 m³,

— loosen soil 1 996.00 m³,

— delivery floor 2 420.00 m³,

— floor exchange 230.00 m³,

— lay geotextile 4 600.00 m²,

— cleanliness layer 270.50 m²,

— concrete for foundations 250.00 m³,

— concrete for substructures 470.00 m³,

— concrete for superstructure 260,00 m³,

— concrete for towplates 40.00 m³,

— concrete for caps 60.00 m³,

— make railings 118.00 m,

— milling asphalt 1 615.00 m²,

— absorb layers without binder 170.00 m³,

— produce antifreeze layer 1 300.00 m³,

— produce gravel base layer 900.00 m³,

— produce asphalt surface layer 220.00 m²,

— produce asphalt binder layer 90.00 t,

— Produce asphalt topcoat 550.00 m².

Download full details as .pdf
The Buyer:
Landesstraßenbaubehörde Sachsen-Anhalt Regionalbereich Süd
CPV Code(s):
45221111 - Road bridge construction work