The new sports hall will be built on the area of the previous sports ground at the school between the school building and Waldschmidtstraße
erected. The building is mainly a reinforced concrete solid construction with EIFS. The roof of the sports hall is designed as a hipped roof. The
Roof construction is designed as an explosive device with wooden trusses and steel tension struts. Buildings for
changing rooms, plumbing, technology, equipment and gallery with a green flat roof.
Exterior building dimensions: approx. 38 x 45 m
Building height: approx. 14 m
masses:
34 locking cylinders
50 Transponder
Programmer with software
Programming and commissioning
Events:
Publication of tender documents: 14.04.2023
Execution September 2023