Expansion of the Altötting District Office (administration building) by the replacement measure Verbindungsbau (basement to 4th floor) with connections to two existing buildings and construction of an office building (basement to 4th floor);
Gross floor area: approx. 5,380 cbm,
Gross volume: approx. 21,370 cbm.
16 toilet facilities incl. connecting cables
9 pcs urinal systems incl. connecting cables
15 pcs washbasin systems incl. connecting cables
3 barrier-free toilet facilities incl. connection cables
3 washbasin systems barrier-free incl. connection cables
6 kitchen connections incl. connection cables
6 plaster basins with 30 litre water heater incl. connecting pipes
2 pcs. Dry risers with 6 tapping points each
29 pcs foam extinguishers each 6 litres
1 Softening system
approx. 200 m internal rainwater pipes