Landsberger Straße in Leipzig, Coppiplatz to Max-Liebermann-Str.
Rehabilitation of mixed water sewer and rehabilitation of drinking water pipe
New sewer construction
Stz pipe DN 300, depth up to 4 m 23 m
Stz pipe DN 400, depth up to 4 m 39 m
Stz pipe DN 600, depth up to 4 m 60 m
New shaft construction up to DN 1500 5 pcs
New shaft construction in the existing brick lower part with in-situ concrete cover 4 pcs
Stülpschacht ca. 1.50 m x 1.75 m x 2.00 m
Renovation of egg profile 1000/1300
Masonry joints clean 1880 m2
MW joints fill 1880 m2
Flat mineral coating 1880 m2
Renovation:
Schlauchliner AK bis DN 150 ARZ II 25 m
Schlauchliner AK bis DN 250 ARZ II 220 m
Schlauchliner HK bis DN 300 ARZ II 20 m
Schlauchliner HK bis DN 400 ARZ II 116 m
Schlauchliner HK bis DN 500 ARZ II 209 m
Hose liner HK to Ei 700/1050 ARZ II 274 m
Hose liner HK to egg 800/1200 ARZ II 114 m
TW pipeline construction
PE-HD Rohr 125 x 7,4 260 m
PE-HD Rohr 160 x 9,5 70 m
PE-HD Rohr 225 x 13,4 10 m
PE-HD 250 x 14.8 600 m
PE-HD Rohr 315 x 18,7 295 m
HA bis PE-HD 63 500 m
Slider up to DN 300 40 pcs
Ventilanbohrschellen 46 St
Unterflurhydrant, DN 80 9 St