Medical gas supply according to DIN 18381
The new building Building D will be built between buildings C and E. The building has 5 storey levels from the site as well as an attached roof centre.
On the north-west side, the building cantilevers with operating theatre and technical floors on the 1st and 2nd floors. (Drawer)
The new structure connects to the crossbar of component C2 in all levels.
The new building D is accessed on the same level via the C-connection building. The existing elevator C-connection
will be renovated and will be expanded to two elevators.
The D-building has a necessary staircase in each case.
The façade of the new building will be continued in the design of the existing building.
The cantilevered structure is equipped with a façade made of compact panels with vertical aluminium slats as sun and privacy protection.
The levels of the new building D (E-1 to E 4 and technical superstructures E5) each form fire subsections / smoke compartments.
In some areas, usage units will be realized.
Smoke extraction from the corridors is carried out via corridor windows or windows.
adjacent area or a SHEV in the ceiling cavity.
Course Summary:
01 Title Supply network for medical gases
02 Title Sampling points
03 Title Control and shut-off valves
04 Title Warning systems - secondary messages
05 Title Carbon dioxide plant 2x2 bottles + 3rd source
06 Title Expansion of the oxygen plant to include O2 monitoring
07 Title Vacuum Central
08 Title DL control panel and accessories
09 Title Distributor for gases
10 Titles Electrical installations
11 Titles of emergency care
12 Titles Other works
13 Titles Other benefits
14 titles Hourly wage work
15 Title Audit Documents