See II.2.4).
The assignment can be extended 3 times. The works are carried out partly for the account of:
1. The municipality of Heist-op-den-Berg (75%);
2. Pidpa (25%)
Desguinlei 246
2018 Antwerp
VAT: 204,908,936
The contractor must therefore always submit 2 progress statements, 2 claims and 2 invoices for approval. The object of the contract is mowing the verges and canal embankments. The basic offer must take into account:
- it is compulsory to collect the clippings within 10 days after mowing and to dispose of the clippings within 3 days after collection to the processing plant as described in III.2 and III.1.c,
- descriptions and plans, as well as other documents applicable to the assignment,
- The standard specification 250 for road construction version 4.1 as well as the documents referred to in this specification specification are generally applicable to the assignment.
- the contract is subject in particular to the specifications, its annexes and the attached statement of requirements.