project management mission for the transformation of the CAVB site into a Hôtel de (7-9 Av. François Vincent Raspail, 94110 Arcueil). This site needs to be rehabilitated to accommodate the new Hôtel de Ville d'arcueil. The site is on plots 071 and 0159, constituting 5988m². The useful surface of the project is 5768m² and its cost of work has been estimated at 10,803,000 euros excluding VAT (excluding pedestrian link options and environmental profile 2). This contract includes a basic mission and two options
the basic mission includes: - diagnostic studies,- preliminary design studies,- final preliminary design studies,- project studies,- assistance in the award of works contracts,- approval of execution studies and synthesis studies,- direction of the execution of works contracts,- assistance with acceptance operations - coordination of fire safety systems (complementary mission)