New construction of a primary school and daycare center at the Lincoln settlement_
The science city of Darmstadt intends to build a new elementary school and day care center with a two-field sports hall in the Lincoln settlement in Darmstadt.
The building will be built in solid construction with load-bearing outer walls and columns as well as economical ceiling spans and stiffening cores. The partitions to the learning landscapes are designed as transparent system partitions in a mullion-transom construction.
Gross floor area: approx. 11 200 m
Levels: 3 including basement
Overall dimensions LxWxH: approx. 96 x 65 x 8 m (over the terrain)
The subject of the tendered services is the performance of the flooring work for the aforementioned project. Reference is also made to the specification of services.