The contract includes the technical building equipment of the "ventilation systems" plant group for the 5th construction phase at the hospital
Ansbach. This measure affects existing parts of the building that are completely or partially renewed, depending on the respective level.
can be installed. The technical facilities for supplying this part of the building will be completely rebuilt.
Ventilation systems:
- Installation of a central HVAC unit (approx. 20,000 m³/h), consisting of supply and exhaust air system, heat recovery system in the
Closed-loop system and related accessories
- approx. 1,375 m² air duct rectangular galvanized steel plus accessories install
- approx. 1,690 m air pipe round galvanized steel plus fittings and accessories install
- Approx. 1,100 built-in parts and air diffusers (volume flow controller, silencer, air valve, cover air diffuser, air grille, etc.) incl. accessories
install
- approx. 120 pcs. install round and rectangular fire dampers incl. accessories
Refrigeration systems:
- Installation of a central chiller (approx. 115 kW) incl. dry cooler and accessories
- Installation of a cold storage tank (approx. 1,500l), distributor-collector combination and automatic pressure retention, refill and degassing station
- approx. 580 m refrigeration pipe steel pipe black with corrosion protection up to DN100 plus fittings and accessories install
- approx. 120 fittings (shut-off valve, balancing valve, check valve, strainer, mixing control valve, pump, refrigeration meter
etc.) install
- approx. 30 fire protection partitions incl. core holes to the aforementioned pipe system
- install approx. 12 units of air conditioning units (ceiling cassette, wall-mounted unit)