S 289 Relocation Fraureuth - Lot 8.3 Restoration of three ponds
The construction project includes the rehabilitation of three ponds in Crimmitschau, Werdau and Fraureuth with the following focal points: - construction site equipment including 800 m of construction road; - water management with ditches, catch dams and mobile pumps; - 9500 m² building clearance including felling work; - 15,500 m³ sediment clearance including interim storage, installation on agricultural land or proper disposal/recycling; - 7,500 m² mineral seal; - Construction of three pond monks with concrete foundation and 40 m basic drain pipe DN 300; - 330 m post-profiling of inlet and outlet trenches; - 300 m² hydraulic engineering work with stone filling, sting and crossbars made of hydraulic building blocks; - 6 m² restoration of road superstructure with asphalt; - 2,500 m² of topsoil work and lawn sowing including completion maintenance; - Planting of 52 shrubs, heisters, solitary and high trunks, including completion care and maintenance work on existing shrubs.