Construction of charging infrastructure at SWU's depot. The construction is to be carried out as a pilot project.
understand. This system is to be implemented at a later date at several locations in the SWU area.
will be executed. Pantograph chargers will be installed to replace the newly procured electric buses.
of the SWU. These are to provide an output of 450kW, with 900kW in the future. The
The charging technology is to be supplied via direct current. This is where the supply comes
directly from the SWU tram network. Thus, the charging technology must be able to
Voltage fluctuations to maintain operation. The charging power is to be measured by means of a pantograph
can be transferred.
Construction of a charging infrastructure for electric vehicles at the depot