For lot 04-015 Baumeister + Site Equipment, the following work is required in the NaturThermeTemplin:
- 100 m2 dust protection wall, foil
- 0.7 m2 concrete cutting work, 25 cm door opening 1.29/0.61 m
- 23 m2 stair wall, sand-lime brick KS, 20-2.0, NM IIa, thickness 17.5 cm,
- 15 st stair step, block step, StB C20/25 15.3/30 cm, L 113 cm
- 3 m2 platforms C20/25, reinforced concrete, exposed concrete, thickness 16 cm
- 13 m2 parapet wall, concrete C 25/30, thickness 17.5 cm, H 90 cm
- 200 m2 floor tiles in thin bed, remove
- 100 m2 wall tiles in thin-bed, remove 15 mm
- Cancel 130 m2 heating screed with pipes and underlay, 100 mm
- 6 m3 concrete cabinet base break out 88/35 cm
- 100 m2 internal wall, aerated concrete PP 2-0.4, thickness 17.5 cm
- 100 m2 drop ceilings demolish drywall
- 25 m2 interior wall break off wall bricks 15 cm
- 4 m2 door opening closing KS, 12-1.2, NM IIa, thickness 24 cm,
- 2 plinths rounded reinforced concrete C25/30, 40 cm, H 60 cm
The NaturthermeTemplin (NTT) is a thermal bath opened in 2000 in
Templin. It is a spa and recreation facility of supraregional importance and is particularly focused on families. NTT was built from 1998 to 2000 and was extensively renovated and partially rebuilt in 2006.
The aim for the planned measures to attractiveness NTT is to further adapt the building, attractions and offers of NaturthermeTemplin GmbH to the needs of the guests and to further increase the quality of stay. In addition, attractions and framework conditions for the warm season are to be created in order to achieve consistent utilization stability. For this purpose, a new sauna cabin, a children's playhouse with an integrated water splash area and dwarf gods, and a guardwork will be built outdoors, among other things.