Scaffolding work | Tenderlake

Scaffolding work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
05 February 2021
Closing Date:
18 March 2021
Location(s):
DEA1F Wesel (DE Germany/DEUTSCHLAND)
Description:
Conversion and extension of the old town hall Rheinberg - scaffolding

Scaffolding (roof / facade renovation).

- 950 m 2 Facade scaffolding LK4, working scaffolding,

- 6 layers: 3-plank; 7th layer: 4-plank,

- 1x additional Tower scaffolding from +12.50 m to +30.00 m,

- 1 600 m 2 Dust protection nets on all scaffolding surfaces,

- 1x scaffolding stair system up to +29.00 m,

- 1x material elevator 1 t, with people basket,

- 75 m roof protection,

- 50 m roof protection wall on pitched roof surface,

- 4 weeks basic standing time,

- 20 weeks release for use.

The "Old Town Hall" in Rheinberg is to be rebuilt according to a usage concept newly developed by the City of Rheinberg. After dismantling and gutting work in various areas of the building, the building envelope will be renovated.

Scaffolding of the building including the corner tower (h ~ 30 m) is required to carry out the facade and roof renovation.

The time it takes to erect the scaffolding is estimated at 2 weeks. The scaffolding must be kept for the entire duration of the roof and facade renovation and is estimated at a total of 6 months (24 weeks).

Download full details as .pdf
The Buyer:
Stadt Rheinberg Zentrale Vergabestelle
CPV Code(s):
45262100 - Scaffolding work