Study, supply, testing, transport, installation (including civil engineering), commissioning of capacitor banks arranged as a filter for TEN and supply of associated spare parts.
The forecast need consists of:
- 400 kV filtered battery (batch 1)
- 225kV filtered battery (batch 2)
400 kV filtered batteriesStudy, supply, testing, transport, installation (including civil engineering), commissioning of 400 kV filtered batteries and supply of associated spare parts.
225 kV filtered batteriesStudy, supply, testing, transport, installation (including civil engineering), commissioning of 225kV filtered batteries and supply of associated spare parts.