Execution of construction works in the field of reconstruction of the following sections of the heating network (s.c.): from chamber O30/L1 to chamber O30/L1A together with connections to Wybieg 14, 21, 22, 23, 24 and Słoneczna 12, 14, 16, 18, 26, 28, 36, 38, 40, 42 - SC II 48.
A detailed description of the subject of the contract includes:
1. project documentation and formal and legal documentation,
2. technical specifications for the performance and acceptance of construction works - part III of SWZ.
Execution of construction works in the field of reconstruction of the following sections of the heating network (s.c.): from chamber O30/L1 to chamber O30/L1A together with connections to Wybieg 14, 21, 22, 23, 24 and Słoneczna 12, 14, 16, 18, 26, 28, 36, 38, 40, 42 - SC II 48.
A detailed description of the subject of the contract includes:
1. project documentation and formal and legal documentation,
2. technical specifications for the performance and acceptance of construction works - part III of SWZ.