Rehabilitation work on 240 housing units spread over 7 buildings. Consistency of the work: insulation of floor soffits, painting of common areas and flexible floors of landings
SealingRepair of waterproofing and insulation of existing roofs, raising of parapets
Facade cladding/ CladdingFacade works: protection and scaffolding, restoration and insulation, painting on existing buildings
Exterior carpentry/MetalworkRemoval and replacement of exterior joinery
Plumbing/ HVACSupply and installation of ventilation units
electricityElectrical work in common areas (electrical cabinets, television, lighting, etc.)
AsbestosSs3 asbestos removal work: treatment of all the bollards on the roof, removal of water and air following the removal of the bolsters on the roof