The Unstrut-Finne wastewater association in Nebra, the Saale-Unstrut water and wastewater association and the Finneland municipality intend to further expand or renew the local drainage systems in the Saubach location in a 5th construction phase, lot 11 as part of a joint construction project. In the course of this, the drinking water supply lines will also be renewed. The community is restoring the remaining areas on W.-Pieck-Straße.
The content of this award procedure is the expansion of the local sewer system, the renewal of the drinking water pipeline and the restoration of the remaining road areas in W.-Pieck-Straße as well as the renewal of the sewer system on the way to the school in Saubach.
Title 1: Construction site equipment
Title 2: Wastewater sewer (W.-Pieck-Straße, Herrentalgrabenweg)
- approx. 620 m sewer DN 200 PP, 14 pcs.PE prefabricated manhole DN 1000, approx. 190 m house connection pipes DN 150,
- 750 m
Title 3: Rainwater Canal (W.-Pieck-Straße, Herrentalgrabenweg)
- approx. 300 m rainwater sewer DN 300 StB, 6 precast concrete manhole DN 1000, approx. 120 m house connection pipes DN 150
- 220 m
Title 4: Wastewater sewer (way to school)
- approx. 105 m sewage sewer DN 200 PP, 6 pcs.PE prefabricated manhole DN 600/1000, approx. 10 m house connection pipes DN 150
Title 5: Rainwater sewer (way to school)
- approx. 75 m rainwater sewer DN 600 StB, 5 pcs. Prefabricated manhole DN 600 / 1,200, approx. 10 m house connection pipes DN 150.
Title 6: Drinking water pipe (W.-Pieck-Straße)
- approx. 350 m pressure pipe made of PE 100 RC, SDR 11, since 125 x 11.4, approx. 70 m pressure pipe made of PE 100 RC, SDR 11, since 32 x 2.9,
- 250 m
Title 7: Remaining areas on behalf of the municipality (W.-Pieck-Straße)
- 1 070 m