Construction works for sewage treatment plants, purification plants and refuse incineration plants | Tenderlake

Construction works for sewage treatment plants, purification plants and refuse incineration plants

Contract Value:
EUR 14M - 14M
Notice Type:
Contract Notice
Published Date:
12 December 2023
Closing Date:
19 February 2024
Location(s):
ITC11 Torino (IT Italy/ITALIA)
Description:
Adaptation and construction of the third thermal sludge drying line at the urban wastewater treatment plant in Castiglione Torinese, with a total contract value of €13,704,140.00.
Castiglione T.se purification plant (prog. 14550). Adaptation and construction of the third thermal sludge drying line. Integrated contract (Ref.APP_25/2023).

Open procedure pursuant to art. 71 of Legislative Decree 36/2023, managed entirely electronically, for the award, through an integrated contract, of the executive design and execution of the interventions for the reduction of the volume of sludge, the adaptation of the dewatering department and the construction of the third thermal drying line for the sludge produced at the urban wastewater treatment plant in Castiglione Torinese.

the contract concerns the executive design and execution of everything necessary for the implementation of the interventions for the reduction of the volume of sludge, for the adaptation of the dewatering department and for the construction of the third thermal drying line of the sludge produced at the urban wastewater treatment plant of Castiglione Torinese.

The total amount of € 13,704,140.00 is divided as follows:

€ 13,540,000.00 for body works, of which € 263,000.00 for safety charges not subject to reduction.

Prevailing category: OS22.

Categorie scorporabili: OG1 – OS30 – OS13.

€ 164,140.00 for executive design calculated, in accordance with the provisions of Annex I.13 to Legislative Decree 36/2023, with the following parameters referred to in Ministerial Decree 17/06/2016:

Category of work Installations - ID. Works IA.01 - Degree of Complexity 0.75.

Category of work Installations - ID. Works IA.04 - Degree of Complexity 1.30.

Category of artwork Structures - ID. S.03 - Degree Complexity 0,95

Final project validation report date: 03/05/2023.

Race Identification Code (CIG): A039BC633E.

Unique Project Code (CUP): G41B21003130005.

The Project Manager: ing. Daniel NOVARINO.

Download full details as .pdf
The Buyer:
SOCIETA' METROPOLITANA ACQUE TORINO SPA
CPV Code(s):
45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants