Construction work of a school group: six kindergartens, nine elementary classes, two bivalent classes + after-school reception, recreation center, school restaurant and central kitchen.
Structural work, closed and coveredStructural work and framing work.
LocksmithLocksmith.
Joineteries/PartitionsWorks of interior carpentry, partitioning, false ceilings.
Finishing worksHard and flexible floor coverings, painting work.
ElectricityElectricity, strong currents, weak currents, photovoltaic panels.
Heating, ventilation, plumbingInstallation works of heating, ventilation, air conditioning, sanitary ware, plumbing.
ElevatorElevator installation.
VRD and landscapingLandscaping and HST work.
Kitchen equipmentWork and installation of kitchen equipment.