Landscape work.
The subject of this list of services is the new construction of the outdoor facilities and the inner courtyards of the replacement building at Ulm University of Applied Sciences.
This service includes the creation of the outdoor facilities on a total area of approximately 18 750 m
- Redesign of entrance area level 0, not built, approx. 3,615 m
- Redesign of green space level -1, not built on, approx. 14 685 m
- Redesign of inner courtyards, built under, approx. 450 m
Quantities
Outside Area:
- Demolition work covering including substructure approx. 500 m
- Demolition work walls about 15 m
- earthworks approx. 3 400 m
- drainage canal works approx. 170 m,
- drainage channels approx. 85 m,
- cable duct structures 6 pieces,
- cable empty pipe approx. 1 800 m,
- Mast / bollard lights including foundations 39 pieces,
- Steel band covering around 1 050 m,
- Stone block paving / lawn paving approx. 555 m
- Water-bound ceiling approx. 825 m
- Asphalt approx. 1 050 m
- step system 205 m,
- precast concrete seating elements space / embankment approx. 86 m,
- L-stone wall approx. 7 m,
- bike hanger 70 pieces,
- steel handrail approx. 30 m,
- otherwise various equipment elements,
- Lawn meadow 13 000 m
- Planting area perennials 2,600 m
- Planting area energy forest approx. 2 400 m
- tree planting 49 pieces,
- Bush planting 56 m
Courtyards:
- extensive greening, approx. 35 m
- intensive greening, approx. 55 m
- Tree trough sheet steel approx. 15 m
- Plant upstand steel sheet approx. 0.6 m
- Various fittings (steel strips, facade channels, roof inlets).
This procedure is under the allocation no. 20-97162. (Please specify when making inquiries).