Construction work for gas pipelines

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 October 2022
Closing Date:
07 November 2022
Location(s):
PL911 Miasto Warszawa (PL Poland/POLSKA)
Description:
Construction and reconstruction of the gas network in the area of Okrąg, Wioślarska, Solec, Ludna streets in the capital city of Warsaw Stage VII.1 of the Project "Construction of a gas network in the Warsaw Agglomeration"

Construction and reconstruction of the gas network in the area of Okrąg, Wioślarska, Solec, Ludna streets in the capital city of Warsaw - Stage VII.1 of the Project "Construction of a gas network in the Warsaw Agglomeration"

The contract is co-financed by the European Union Regional Development Fund under the Infrastructure and Environment Operational Programme 2014-2020. Action: 7.1 Development of smart energy storage, transmission and distribution systems. Priority axis: VII Improving energy security under the Agreement for subsidization No POIS.07.01.00-0016/16-00 Project “Construction of a gas network on the territory of the Warsaw Agglomeration”, POIS.07.01.00-00-0016/16

Unlimited, full, direct and free access to information is contained in the SWZ with attachments available on the website of the Ordering Party https://zamowienia.psgaz.pl - Public proceedings - 2022/W400/WUP - 000087

The subject of the contract is the construction and reconstruction of the gas network in the area of Okrąg, Wioślarska, Solec, Ludna streets in the capital city of Warsaw - Stage VII.1 of the Project "Construction of a gas network in the Warsaw Agglomeration", i.e.:

1) construction / reconstruction:

a) low pressure gas network (steel) with connections to the medium pressure (PE) network together with medium pressure connections

(b) low pressure installations

c) decommissioning of the existing steel gas network,

2) delivery of start-up media – if required,

3) execution of works accompanying the construction / reconstruction referred to in point 1).

Location: Warsaw- Śródmieście District

Oj Nos 34, 37, 38, 26, 27, 29/1, 1, 47, 11/2, 13/6, 13/11, 13/12, 13/13, 13/15, 13/16, 13/20, 13/21, 13/25, 13/26, 14/2, 14/3 5-06-04 Dz. ew. nr 12, 19, 20 z obr. 5-06-03;

Total length of the gas network after reconstruction: L = approx. 1318.0 m (length may increase by the length of approach sections)

Technologia rur: PE100 RC SDR 17

PE100 RC SDR 11

PE 100 SDR 17,6

Pipe diameters used:

DN125 PE100 RC SDR17, L= ok. 1.0 m;

DN90 PE100 RCSDR17, L= ok. 361.0 m;

DN63 PE100 RC SDR11 L= ok. 536.5 m;

DN25 PE100 RC SDR11, L= ok. 62.5m;

DN32 PE100 RC SDR11, L= ok. 96.5 m

DN40 PE100 SDR11 L= ok. 255.0 m;

DN90 PE100 SDR11, L= ok.5,5m (inst.)

Detailed technical solutions can be found in the project documentation constituting Annex 4 to the Agreement.

For the execution of Stage VII.1, the Ordering Party made an effective notification of the construction of 16.09.2021 and obtained a decision for building permit 330/Ś/2021 of 4 November 2021.

A detailed description of the contract and the Contractor's obligations includes:

1) Description of the Subject of the Order (OPZ), constituting Appendix No. 2 to the Agreement,

2) Technical Conditions No PSGWA. ZMSM.763.065.19.G of 06.02.2019, constituting Appendix No. 3 to the Agreement,

3) Project together with the Notification of construction works not requiring a building permit of 16.09.2021. and certificate of non-objection of 15.11.2021. and the decision on building permit 330/Ś/2021 of 4 November 2021, constituting Appendix No. 4 to the Agreement, and

4) Technical specification of execution and acceptance of construction works constituting Appendix No. 5.

Order completion date:

a) the deadline for technical acceptance of works is set at 8 months counted from the date of conclusion of the Agreement

b) the deadline for final acceptance of works is set at 10 months counted from the date of conclusion of the Agreement

Pursuant to Article 257 of the PPL Act, the Contracting Authority may cancel the procurement procedure if the public funds that the Contracting Authority intended to allocate to finance all or part of the contract have not been granted to it.

The address of the Ordering Party's website, on which the procedure is posted, the Specification of the Terms and Conditions of the Contract (SWZ) together with attachments (including the Model Contract and the Instructions for awarding contracts co-financed by the European Union in PSG sp. z o.o. (Issue 8 of 23 September 2021) and on which changes and explanations of the content of the SWZ and other procurement documents directly related to the procedure will be made available: https://zamowienia.psgaz.pl - Public proceedings - Procedure number: 2022/W400/WUP - 000087

The Ordering Party reserves the right to change the content of the SWZ and the announcement, including changing the dates contained therein. The contracting authority does not provide for the award of contracts referred to in Article 388(2)(.c) of the PPL Act.

Unlimited, full, direct and free access to information is contained in the SWZ with attachments available on the Contracting Authority's website https://zamowienia.psgaz.pl - Public proceedings - Procedure No.: 2022/W400/WUP - 000087

Download full details as .pdf
The Buyer:
Polska Spółka Gazownictwa sp. z o.o. Oddział Zakład Gazowniczy w Warszawie
CPV Code(s):
45100000 - Site preparation work
45111200 - Site preparation and clearance work
45111250 - Ground investigation work
45111300 - Dismantling works
45112000 - Excavating and earthmoving work
45231220 - Construction work for gas pipelines
45231221 - Gas supply mains construction work
45233140 - Roadworks
45233200 - Various surface works
45233222 - Paving and asphalting works
45262212 - Trench sheeting work
45333000 - Gas-fitting installation work