LAZBW MFG - Electrical installation
The present building is the new construction of a multifunctional building in the LAZBW in Aulendorf. This includes a milking area for cows from the neighbouring barn on one half and a seminar area on the other half. In the basement there are social and technical rooms.
In the partial basement area, the electrical installation, except for technical areas, is to be installed flush-mounted. This area is made of prefabricated/in-situ concrete and is to be provided with empty pipes during the concreting work. The further construction of the building consists largely of timber construction.
In the seminar area, the flush-mounted installation is also to be realized. Here there are wooden stud walls for laying the cables and the rooms above the floor, where only technical systems are located, are accessed. In the barn area, the installation is carried out using surface-mounted technology. Here, the beam-ceiling structure is visible, and the installation is laid along this structure.