The DEAUVILLE station (14), consisting of four platforms serving 7 main tracks and 3 service lanes, is located on the line from LISIEUX to DEAUVILLE-TROUVILLE (390,000), at Km 219+265.
• Work to bring docks up to standard:
o Adaptation of the height of the platforms, in accordance with the layout characteristics of the mid-height platforms (IN00163 “Gauges and layout of passenger platforms”), on respective lengths of:
230 m for the platform lane B
300 m for the platform lane C
300 m for the platform lane D
300 m for the platform E track
305 m for the platform F track
300 m for the platform lane G
o Creation of connection ramps at the end of the platforms or transition ramps, to preserve excess lengths;
o Repair of the platform body supporting the pavers on the whole forecourt and on the D/E/F/G track platforms:
o Upgrading of the body of the docks, including adaptation and enhancement of manholes and draft chambers;
o Implementation of a sealed alert system, over the entire length of the raised platforms;
o Implementation of a quayside covering in thin bituminous concrete or pavers depending on the location over a width consistent with the traffic of PRMs, including structural recovery;
o Implementation of an asphalt pavement under the canopies;
o Creation of a sanitation system that takes up rainwater from the forecourt;
o Creation of sanitation to recover rainwater from the docks of tracks B to G (excluding the awning);
o Removal and reinstallation of furniture impacted by the rework of coating;
o Repainting of the quayside candelabras including repair of the massifs;
o Repainting of the posts supporting the canopies and adjustment of the heights of the posts legs;
o Repainting of the railings at the end of the platform;
o Repainting of reinforced concrete canopies (under exposed faces);
o Recovery of structures impacted by the creation of sanitation along the docks;
o Securing
The work includes the following operations:
- The uplift of the docks,
- The renovation of the PASO and the stairs
- Setting up elevators from the bridge (F and P elevators not included in this contract)
- Upgrading lighting and sound systems