structural work
1 piece of construction site equipment
1 piece demolition appendix building
approx. 2m³ demolition of masonry
approx. 65m² PMBC sealing
approx. 20m³ excavated excavation pit homogeneous range A2 to A5
approx. 30m³ excavated excavation pit homogeneous range A6 to A7
approx. 25 kg 2000 sewer pipe DN100 to DN200
1 piece plant and assembly planning concrete and reinforced concrete work
approx. 1,440m² in-situ concrete cleanliness layer C 12/15
approx. 120m² allowance for cleanliness layer C 12/15 in the incline
approx. 980m³ in-situ concrete floor slab, WU concrete
approx. 980m³ in-situ concrete floor slab, WU concrete in the inclined course
approx. 660m³ in-situ concrete exterior walls, WU concrete
approx. 535m³ in-situ concrete interior walls
approx. 1,770 m³ in-situ concrete ceiling tiles
approx. 1,390m² formwork external walls
approx. 2,070m² formwork interior walls
approx. 5,400m² formwork ceiling tiles
Approximately 0.000m² SB3 display formwork allowance
approx. 19 pieces of precast concrete stair run
Approx. 550m earth cable V4A steel
approx. 2,500m potential equalization in concrete components, galvanised steel
approx. 2,360m² heating/cooling circuits
Approx. 2,360 m² tube carrier mats
approx. 1,680m distribution line according to Tichelmann 40mm
approx. 480m² KSL-R (P) - masonry 11.5 to 24cm
approx. 90 pieces creation of recesses A = 0.10 to 1.00m²
1 piece plant and assembly planning sealing measures
approx. 2,100 m² FBV system
approx. 120m² PMBC sealing
approx. 660m² insulation exterior walls, XPS, 120mm