The construction project involves the upgrading / general renovation and expansion of the Carl Friedrich von Weizsäcker-Gymnasium at Karl-Mücher-Weg 2 in 40878 Ratingen.
Renovation of the Carl Friedrich von Weizsäcker-Gymnasium in 40878 Ratingen in a total of 5 consecutive construction phases and necessary interim measures; here BA II and accompanying measures with the following benefits:
Component I (Technology UG)
Connection of SiBe to ZBA + BMA + ELA, expansion of E30 laying route, fire protection
Component II
2 pcs circuit distributor + 1x conversion of existing building, approx. 750m laying aids, approx. 60m E30 route, approx. 360 pcs. installation equipment,
approx. 300m power cable, approx. 18,000m cable + wires, approx. 1,000m E30 cables, approx. 45 pcs. safety lights and RZL, 1pc SHEV
Staircase, sun protection with 26 pcs. Multiple switching actuators and 1x HUB, 9 pcs. slave clock, approx. 90 pcs. Loudspeaker 100V, approx. 20 smoke detectors + 6pcs manual detector on existing BMA, transmission network with approx. 44 pcs. RJ45 sockets, approx. 2200m Cat.7a, 2x DV-VT 19"; Connection via fiber optic multimode;
Ancillary services Fire protection, commissioning, inspection documents and acceptances
Component IV
Construction of the E30 route through BA II and IV approx. 60m corridor crossing in E30, E30 lines up to fire section 2x2x0.8, 2x2x0.8BMA, 3x2.5 total approx. 1200m, ancillary services fire protection, inspection documents and acceptances
Component V
Construction of the E30 path and approx. 30m corridor crossing in E30, E30 lines up to fire section 2x2x0.8, 2x2x0.8BMA, 3x2.5 in total approx. 1,000m, ancillary services fire protection, inspection documents and acceptances