The HBSS supplier is required to provide ECAC Standard 3 EDS Machines and associated infrastructure as is required for the Project.The BHS Portion of the works will be supplied by others. The EDS machines shall be installed in 3 locations:
— 4 machines in baggage factory 2,
— 3 machines in the terminal 3 Basement,
— 2 machines in the baggage factory 3.
In addition, the HBSS contractor shall provision:
— 20 HBS level 2 operator workstations,
— 4 HBS level 3 workstations,
— 6 training workstations,
— 2 TIP servers,
— HBS servers,
— 2 years HBSS operations and maintenance during the general warranty period,
— 2 years HBSS operations and maintenance contract, following completion of the general warranty period.
The HBSS Supplier shall furnish all labour, materials, and equipment necessary to undertake the installation, commissioning, acceptance testing and handover of the HBSS works.
The precise volume of the supplies is described in the tender material.