Complex refurbishment State High School Ernestinum, Bergallee 8, 99867 Gotha - 2nd construction phase Component "E"
Facade works ETICS.
- about 300 m 2 External thermal insulation system (ETICS) with 16 cm mineral wool insulation,
- about 50 m 2 ETICS in the base area with 12 cm EPS insulation,
- about 350 m 2 Facade paint,
- Approx. 21 pcs aluminum window sills.