Surveying services
It is currently assumed that 2 independent buildings will be built. However, the two buildings BDC and CSME are directly spatially related and must be designed structurally, separately from the technical building equipment and the supply and disposal systems.
The current status of work is based on 5 full storeys with a maximum floor height of 5 m, followed by a recessed staggered storey and a high point of the building as an accent. This results in a building height of max. 30.0 m to the upper edge of the attic and max. 37.0 m for the high point of the building.
The BDC area will comprise approx. 15,000 m2 gross floor area and 10,000 m2 of which will be usable area. The area of the CSME is dimensioned for 10,000 m2 gross floor area and 6,000 m2 of which is usable area.
The plot intended for construction has an area of approximately 16,000 m2 and is adjacent to public transport space.
The content of this tender is the technical planning for thermal insulation and energy consulting for the new building of the BDC and CSME
The client reserves the right to commission individual stages together.
An unconditional legal claim to commissioning the further services does not exist.