The acquisition is subject to the design services framework arrangement for the needs of the Turku region treatment plant Oy. Planning work is subject to projects such as development of the facility, expansion of the administration building, and network paning planning.
Three service providers are selected for the Framework Arrangement and will be competitive for a four-year contract period.
Design areas used in the service include the design areas listed below:
• PRT (process planning);
• TEH (factory design) and
• RAK (building/structural engineering)
• INST (instrumentation design)
• SKT (electrical design)
• ARK (architectural design)
• Plumbing (thermal, water, air conditioning design)
• RAU (building automation design)
• TAU (factory automation design)
• VHT (network design)
• PAL (fire engineering)
• GEO (geotechnical design)
• KAT (rock engineering design)