The contract includes a firm tranche and two optional tranches:
- firm phase: phase 1: assistance during the design phase of the DMA recovery and processing unit;
- optional tranche 1: phase 2: monitoring of the implementation of the unit for the valuation and processing of AMD;
- optional tranche 2: phase 3: monitoring of the operation of the DMA recovery and processing unit.
The contract includes a firm tranche and two optional tranches:
- firm section:
—— phase 1: assistance during the design phase of the DMA recovery and treatment unit:
——— mission 1: assistance during the design phase;
——— mission 2: assistance during the administrative phase;
——— mission 3: assistance in the verification of execution and summary studies;
- optional tranche 1:
—— phase 2: monitoring of the implementation of the unit for the promotion and processing of AMD:
——— mission 4: assistance in controlling the work to be carried out by the delegatee;
——— mission 5: assistance with vacuum test operations, assistance in monitoring industrial commissioning (MSI) and operations for receiving works;
——— mission 6: assistance during the period of the guarantee of perfect completion;
- optional tranche 2:
—— phase 3: monitoring of the operation of the AMD recovery and processing unit;
——— mission 7: checking the operation of the installation;
——— mission 8: monitoring of routine maintenance work and the GER and verification of the CMMS;
——— mission 9: control and analysis of the elements and technical indicators constituting the delegatee's annual report;
——— mission 10: ad hoc technical and regulatory assistance.