Baustelleinrichtung:
Approximately 910 m
about 65 m
approx. 420 m Laying of underground lines incl. bows, Abzw., connections to existing lines etc.
Interior decortication of 6 nursing stations on 2 floors with partial pollution by KMF:
- Approx. 5 600 m
- Approx. 6,000 m
- about 2 000 m
- various concrete and masonry demolitions,
- various concrete cutting and core drilling.
Approximately 2 420 m
Various dust protection and safety work
Approximately 25 m
Approximately 50 m
Approximately 1220 m
Approximately 75 m
Baustelleinrichtung:
Approximately 910 m
Approximately 65 m
Approximately 420 m laying of underground lines including bows, Abzw., Connections to existing lines etc.
Interior decortication of 6 nursing stations on 2 floors with partial pollution by KMF:
- Approx. 5 600 m
- Approx. 6,000 m
- about 2 000 m
- various concrete and masonry demolitions,
- various concrete cutting and core drilling.
Approximately 2 420 m
Various dust protection and safety work
Approximately 25 m
Approximately 50 m
Approximately 1220 m
Approximately 75 m