The regional school north in Neubrandenburg is a complex consisting of three buildings of the type POS SR 80 Dresden. The individual buildings each represent self-contained structures that are neither structurally nor structurally dependent on each other. The building parts were erected in reinforced concrete slab construction with ceiling-bearing outer and inner longitudinal walls in the construction "WBS 70 G, GH 3300" (former GDR construction).
Size of the building parts L x W x H:
House A: 20.4 x 18.0 x 13.2 - 4 floors House B: 32.4 x 18.0 x 13.2 - 4 floors House C: 16.8 x 12.0 x 9.9 - 3 Projectiles - connectors For more see II.2.4).
- construction site equipment
—— meeting container 1 pc.,
—— Construction fence (steel frame), including construction gate approx. 50 m
——— protective measures,
——— construction power,
——— Construction water - demolition work.
—— Disassembly of interior doors 114 pieces,
—— Disassembly of the stair railing approx. 90 m.
——— Demolition wall tiles about 125 m
——— Demolition of floor tiles approx. 730 m
——— Demolition of terrazzo slabs approx. 240 m
——— Disassembly of the staircase run with 11 stairs. 6 pc.
—— Demolition of starboard inner walls approx. 695 m
——— Enlargement of openings, demolition starboard parapet approx. 60 m
——— Enlargement of openings (inner walls of the starboard), sawing process approx. 145 m,
——— Dismantling the weather pan approx. 150 m
——— Make openings, inside walls of the starboard approx. 195 m
- Excavation excavation approx. 290 m
——— Excavation along the outer wall existing about 205 m
——— Excavation frost apron approx. 60 m
—— Open water drainage - underground pipes,
—— sewage pipe KG pipe approx. 145 m.
——— PP-MD liposuction line approx. 50 m,
——— Drinking water underground pipe approx. 25 m,
——— protection tube electrical approx. 120 m,
——— Digging trenches in the building approx. 140 m - masonry work.
—— Inside wall of KS masonry approx. 375 m
——— precast lintel KS 17 St.,
—— Adjusting door openings approx. 35 m:
——— Masonry of openings, some small areas approx. 170 m
——— anchor channels approx. 150 m,
——— Wall connection anchor approx. 980 pieces ..
—— threaded rods approx. 730 pieces ..
- Concrete and reinforced concrete work:
—— Cleanliness layer approx. 280 m
——— starboard base plate 50 cm approx. 265 m
——— starboard inner walls approx. 735 m
——— starboard outer walls approx. 585 m
——— starboard parapet approx. 45 m,
——— starboard supports approx. 50 m,
——— starboard blankets approx. 1 100 m
——— starboard beams approx. 75 m,
——— Stb.-precast stair run, 10 Stg. 6 pcs.,
—— starboard ceiling replacement approx. 405 m
——— reinforcement, steel bars approx. 80 t,
——— reinforcement, matt steel approx. 20 t - sealing work,
—— KMB waterproofing approx. 180 m2:
——— Perimeter insulation approx. 180 m
—— steel frame approx. 61 t:
——— door lintel reinforcement approx. 2.5 t,
——— steel supports approx. 4 t,
——— Fan center (component position: roof) approx. 6.5 t,
——— Fan center, trapezoidal steel sheet profile approx. 120 m
——— Fan center, sandwich elements approx. 165 m