Road construction work, bridge construction work.
Road construction work, bridge construction work
Bridge construction work BW 54
- Demolition of the existing structure (2 sub-structures with a total of approx. 400 m
- Replacement new building (2 partial structures with a total of approx. 500 m
- Back-anchored pile pile wall in the central reservation
Earthworks and road works in the course of the A3
- Adjustment of the lane widths in the area of the bridge to the 6-str. Expansion;
- Partial construction of the noise protection wall in the area of the bridge;
- Construction of the new road drainage in the area of the bridge;
Earthworks and road works in the area of the secondary road;
- Traffic safety work (closures, etc.);
- sheeting work;
Complete expansion and renewal of the Graßer Weg in the area of the bridge, including the sidewalks and bike paths.