- Lot 24 carpentry work - Award no. 21 VOB 018,
- Lot 25 tile work - Award no. 21 VOB 019.
Lot 24 carpentry work - award no. 21 VOB 018- 23 steel multi-purpose door, single-leaf, fire protection requirement,
- 55 inner door, single-leaf, wood-based material, noise protection requirement, fire protection requirement,
- 19 door systems with surrounding frames, fire protection requirements, keeping open,
- 20 pieces interior doors, wood-based material, damp-proof doors,
- 4 pieces of door elements with side panel, 210/220 cm, noise protection requirement, fire protection requirement,
- 3 interior doors, single-leaf, stainless steel in the kitchen area,
- 1 piece of folding shutter, electrically operated,
- 65 sqm wall cladding, wood-based material, veneered with substructure,
- 3 internal glazing, fire protection requirement.
Performance dates:
- Workshop planning / order: 25.05. - 22.10.2021,
- Interior doors / joiner BT 1: 25.10. - 11/26/2021,
- Interior doors / Tischler BT 2: 29.11.2021 - 14.1.2022,
- Interior doors / joiner BT 3: 17.01. - February 18, 2022,
- Other carpenter: 21.02. - 14.4.2022.
Lot 25 tile work - award no. 21 VOB 019- 520 sqm underground preparation wall sanitary areas,
- 144 sqm floor sealing sanitary areas,
- 520 sqm wall tile according to the tile plan with multi-colored sprinklers,
- 144 sqm porcelain stoneware flooring,
- 160 running meters of base,
- 19 mirrors, flush with the tiles,
- 160 running meters of edge protection,
- 700 running meters of permanently elastic grouting,
- 90 sqm wall sealing kitchen,
- 40 sqm kitchen floor sealing,
- 90 sqm wall tiles kitchen,
- 40 sqm kitchen floor tiles,
- 67 sqm plate sign wall tile behind the sink,
- 150 running meters of permanently elastic grouting.
Performance dates:
- Tile work BT 1: 25.05. - 13.8.2021,
- Tile work BT 2: 16.08. - 17.9.2021,
- Tile work BT 3: 20.09. - 29.10.2021.