Vaggeryd Energi AB intends to construct a new accumulator tank next to the heating plant on the property Skogshyltan 1:15 on a turnkey contract.
The contract includes delivery of a fully operational accumulator excluding work with land and construction work.
Bolt rims/screws for fastening the accumulator are included in the contract and will be delivered to Vaggeryd Energi AB in connection with the construction of foundations in good time.
The contract includes design, design, manufacture, delivery and assembly of all components, as well as commissioning, documentation and training of the Client's personnel. The contractor is also responsible for and pays for inspection, testing, inspection and control imposed by authorities.
Furthermore, the Contractor shall produce building control documentation for construction (the Foundation) and drawings for building permits, no later than two weeks after the signing of the contract.
In terms of time, the accumulator will be operational (heat-producing) in November 2024.
The customer expects the functional check and final inspection to be completed during Q1, 2025.