Locksmith / metal construction work - New construction of sports hall - Ulm
Generally:
The new building is a 2-part sports hall, 2-storey, with adjoining ancillary room span for fitness area and supplementary use.
Bruttogrundfläche: 2.324 m², Bruttorauminhalt: 16.527 m³
Locksmith / metal construction work, consisting of:
1) Internal staircase as a stringer staircase, straight, 2 runs with grating steps, landings and railings. Staircase serves as an assembly/auxiliary staircase for later maintenance work on the roof.
2) Stair railing on existing concrete stairs from the basement-ground floor, made of belts and rods. Without railing posts.
3) Fall protection from the foyer on the ground floor to the UG playing field made of profile/angle steel with floor-to-ceiling cable net filling.
4) Lattice wall in the equipment room ground floor made of posts and filling of steel mesh mats.
Galvanizing, coatings, surface treatments, stainless steel finish can be found in the individual positions.