Drywall work, interior doors and frames Component North
For the economic reorganization of the South-West Hospital Network, the Böblingen and Sindelfingen clinic locations will be merged into a new building on the airfield site in Böblingen. According to the task, it was necessary to unite the medical concerns of a large hospital with its close functional relationships with the urban context, based on the results of the urban planning ideas competition. The references to Böblingen station / city center, as well as the urban development guiding idea and urban development should be seamlessly taken into account and integrated into the planning area in the planning. A house with about 700 beds and 15 operating theatres (of which 2 are reserve areas) is planned. The client is Kreiskliniken Böblingen gGmbH in the name and on account for the in-house operation of building management of the böblingen district.
The subject of the procurement is drywall work, interior doors and frames of the northern component:
Trockenbauarbeiten:
- Vorsatzschale 19.174,5 m²
- Installationswand: 4.381 m²
- Partition wall without fire protection: 33,744 m²
- Partition wall with fire protection: 16,583 m²
- Trockenputz: 12.189 m²
Wood doors:
- Wooden interior doors without fire protection: 1476 pcs. (of which radiation protection 37 pcs.)
- Wooden interior doors with fire protection: 706 pcs.
- Wooden sliding doors o.B.: 102 pcs. (of which with fire protection 61 pcs.)