Flat roof waterproofing bituminous:
- Vapor barrier (DIN EN 13970): approx. 1 150 m
- Thermal insulation EPS 035 i. M. 250 mm: approx. 1 150 m
- 1st sealing layer (DIN EN 13707 and DIN EN 13969): approx. 1 150 m
- Upper layer (DIN EN 13707 and DIN EN 13969): approx. 1 150 m
Sheet metal work:
- downpipe - round: approx. 132 m,
- standpipe with cleaning opening approx. 12 St,
- roof / emergency drainage approx. 24 hours,
- Wall cover aluminum. about 263 m,
- fume pipe / sanitary ventilator approx. 15 St ..
Carpentry:
- Wooden exterior wall construction approx. 24 m
- Ceiling construction approx. 16 m
- roof terrace with wood covering + substructure roof terrace: approx. 148 m
Flat roof waterproofing bituminous:
- Vapor barrier (DIN EN 13970): approx. 1 150 m
- Thermal insulation EPS 035 i. M. 250 mm: approx. 1 150 m
- 1st sealing layer (DIN EN 13707 and DIN EN 13969): approx. 1 150 m
- Upper layer (DIN EN 13707 and DIN EN 13969): approx. 1 150 m
Sheet metal work:
- downpipe - round: approx. 132 m,
- standpipe with cleaning opening approx. 12 St,
- roof / emergency drainage approx. 24 h.,
- Wall cover aluminum. about 263 m,
- fume pipe / sanitary ventilator approx. 15 pcs,
Carpentry:
- Wooden exterior wall construction approx. 24 m
- Ceiling construction approx. 16 m
- roof terrace with wood covering + substructure roof terrace: approx. 148 m